FSG Awarded Woolgoolga to Ballina

FSG Awarded Woolgoolga to Ballina

July 20, 2017

As part of the successful ASF Bachy Soletanche team, FSG have been appointed as the independent Geotechnical verifier & temporary works designer for piling works on Packages A to D on the W2B project. We currently have three engineers on site full time supervising piling works and platform construction.

Read More

FSG awarded SI and Detailed Design – Rocklea to Darra Stage 1

FSG awarded SI and Detailed Design – Rocklea to Darra Stage 1

July 18, 2017

As part of the successful Beilby Hull Albem Joint Venture Team, FSG has been awarded the site investigation and detailed design of all geotechnical elements on the $400M R2D stage 1 project.

Read More

Brisbane Office Move

Brisbane Office Move

May 9, 2017

In April 2017, FSG's Brisbane office moved to 74 Astor Terrace, Spring Hill. Continued growth and additional geotechnical services required a larger office area.

Read More

2017 Deep Foundations Institute (DFI) Conference

May 9, 2017

FSG’s senior team continue to take technical leadership by its involvement at the DFI Conference held in Melbourne, Australia in March 2017.

Read More

Brisbane Office Staffing – January 2017

Brisbane Office Staffing – January 2017

May 9, 2017

In January 2017, Adam Kemp joined FSG’s Brisbane office as a Senior Geotechnical Engineer. Adam is a chartered geotechnical engineer, post graduate qualified specialising in geotechnical engineering and design. He has over 15 years of industry experience and was previously an Associate at AURECON. Adam has specialist knowledge in soft ground engineering, slope stability, stabilisation, retention and ground improvement. Adam has considerable experience in leading the planning and execution of geotechnical investigations and design for large infrastructure projects.

Read More

AWARDS – 2016

AWARDS – 2016

May 9, 2017

In September, Dr David Lacey of FSG’s Brisbane office received the award of Queensland Young Professional Engineer of the year 2016. David went on to also become the Australian Young Professional Engineer of the year 2016.

Read More

FSG purchase Light Falling Weight Deflectometer (LFWD)

FSG purchase Light Falling Weight Deflectometer (LFWD)

September 7, 2016

The Light Falling Weight Deflectometer (LFWD) is an fast and effective way to measure a composite in-situ modulus value of near-surface material. The modulus parameter returned by this quick field test is a function of the measured peak applied loads and associated peak deflection which are all recorded and analysed on site via wireless tablet. As the LFWD measures composite modulus it is able to assess the effects of geotextiles and the results are not adversely affected by larger sized particles in the matrix making the LFWD an idea way to assess engineered construction platforms on site.

Read More

Wharf Remediation in NZ

Wharf Remediation in NZ

December 5, 2014

Remediation of earthquake damaged wharf structures at Cashin Quay, Berth 2, New Zealand, required FSG to complete extensive design and constructability assessments for new wharf piles for Opus and the Port of Lyttelton, as well as implementation of practical and effective verification processes.

Read More

State of the Art Testing and Verification in QLD

State of the Art Testing and Verification in QLD

December 5, 2014

FSG has implementd state-of-the-art installation monitoring and verification processes for precast piles for John Holland and DTMR on the Yeppen Floodplain Upgrade Project in Queensland.

Read More

Streamlined Pile Sign-off Processes

Streamlined Pile Sign-off Processes

December 5, 2014

FSG developed streamlined design verification processes to review and sign-off tubular steel piles without delays for Rio Tinto/SKM at the Cape Lambert - Port B Project in Western Australia.